New ICU in Puerto Real: the building in 3D before it is built
For a hospital tender we built the whole building of a new intensive care unit in Puerto Real in 3D and produced a 75-second walkthrough to accompany the contractor’s bid.

- We did
- Modelling, materials, lighting and video
- With
- Blender, Cycles and Python
- Status
- Eighth version of the walkthrough
1The brief
In a construction tender, the technical bid is judged on paper: reports, drawings and diagrams. A committee has to imagine the building from documents that were never meant to show it. A video walkthrough solves that: it shows the project as it will be experienced, with real light, materials and scale.
The brief was to produce that walkthrough for a new ICU in Puerto Real, in support of a contractor’s bid.
2What we built
We started from the tender drawings and built the whole building, not just a façade:
- The building’s exterior and its immediate surroundings.
- The patient terrace.
- The clinical interiors, with their materials and lighting.
- A 75-second camera path that ties everything together in one video.
3How it was made
Modelling, materials and lighting were done in Blender and rendering in Cycles, its ray-tracing engine. What repeats on every run (preparing scenes, launching the render, checking the result) was automated in Python, so a camera or a material can be changed without redoing work by hand.
We work in versions: each one is reviewed, the changes are noted and it is rendered again. The walkthrough is on its eighth version.
4Where it stands
The tender it accompanies is still open, which is why we only show a still image from this project and not the video. We give no further details of the tender or the contractor until it is decided.
5What kind of company could use something similar
Contractors and engineering firms bidding in tenders where technical quality scores, and developers who need to show a building before it exists. Because it comes from software, the model is not a closed drawing: it can be rendered again with another camera, another time of day or another finish when the project changes.
6Related projects

AESC Gigafactory
Aerial walkthrough of a battery plant in Navalmoral de la Mata
Another real-scale walkthrough, this time from the air, of a battery plant in Navalmoral de la Mata, with production set up like software.
Video delivered in September 2026

Certero
Tender intelligence for public works
Our product for bidding on public works: it reads tender documents and award records and estimates the discount that wins each tender.
Live at certero.es. Accepted into NVIDIA Inception.
7Frequently asked questions
What do you need to start a walkthrough like this?
The project drawings and whatever material specifications exist. With those we build the model and show you a first version to review.
Why can’t the video be seen?
Because it accompanies a tender that is still open. Until it is decided we only show a still image.
Can the video be changed if the project changes?
Yes. The model and the render pipeline are set up to produce the video again with changes, without starting over.
Do you also build software to prepare the bid?
Yes. With Certero we handle the data side of a tender: documents, award records, competitors and the discount.
Do you have a bid to show?
Send us the tender drawings and we will tell you what we can prepare and at what level of detail.
Tell us your problem