Food traceability software: batches without rebuilding folders

A food business needs to know which raw materials went into each batch and where each batch went. It almost always does, but spread across delivery notes, production sheets and spreadsheets. We build the system that brings it together.

1Where the data lives today

Raw material arrives with its delivery note and the supplier’s batch number, which someone records at goods-in, sometimes on paper. In production a sheet records what was used, in what quantities and which own batch came out. At dispatch, the sales delivery note carries that batch to the customer. Three moments, three formats and often three different people.

While everything goes well, nobody misses anything. The problem appears with a supplier alert, a complaint or an audit: you have to answer quickly which of your batches contain that raw material and which customers they were sent to.

2The moments the chain breaks

It rarely all fails at once. One link fails:

  • Goods-in records the delivery note but not the supplier’s batch.
  • Production uses two batches of the same ingredient and the sheet records only one.
  • Rework or leftovers go back on the line without being recorded.
  • Supplier specifications and certificates sit out of date in a shared folder.

3What we build

We start by running a real traceability query with you, with the clock running: we pick a batch that has been sold and trace its raw materials, and the other way round. How long that test takes shows where to begin.

  • Goods-in recording on a tablet or phone, reading the supplier’s delivery note and batch, with an alert if it is missing.
  • Production sheets that suggest the available raw material batches and ask for confirmation, instead of leaving a blank field.
  • Backward and forward traceability from any batch, with the original documents linked.
  • Tracking of supplier specifications and certificates, with an alert before they expire.

4What remains your team’s job

The system does not replace your quality manager or your food safety plan. It does not decide whether a batch is released or withdrawn: it gathers the data so that decision is taken quickly with the papers in front of you. What regulations or your auditor require, you define with your adviser, and we turn it into fields, alerts and records that cannot be skipped.

Nor do we change the way you produce overnight. Each phase is first tested alongside your current way of working, and paper is only retired once the plant team is comfortable.

5What we have already built that resembles it

  • Farmacta: A pharmacy’s back office, built on its paperwork

    Farmacta

    A pharmacy’s back office, built on its paperwork

    Farmacta reads delivery notes and invoices from wholesalers and laboratories as PDFs and extracts every line. Recording incoming raw material with its delivery note uses the same piece. We do not yet have a published case with a food business.

    In use at its first pharmacy

    See the project page

  • VendorCheck: Supplier screening against official sanctions lists

    VendorCheck

    Supplier screening against official sanctions lists

    VendorCheck records every check on a supplier with its source and date. It is the same principle that supplier documentation in a quality system calls for.

    In development. Matching against the official lists works; accounts, billing and alerts are coded and not yet connected. The screens are shown with an invented demo workspace.

    See the project page

See all projects

6Frequently asked questions

Does it work in a plant with no computers on the line?

Yes. Usually it is a tablet or phone at goods-in and in production, designed to be used with gloves on and in a hurry. If an area has no signal, we account for that in the design.

Does it replace our management software?

No. Purchasing, sales and invoicing stay in your software and we connect to it. What we add is the batch tracking that currently lives on paper.

Does it guarantee we pass an audit?

No. No software can. We help you keep complete records and find them quickly; the content of the plan is defined by your quality manager.

How long until it is running?

We do not give timelines before the diagnosis. We can tell you that we work in short phases and the first is usually goods-in only.

Let’s run a traceability query together

Pick a batch you have already sold. Seeing how long it takes to rebuild today is the best starting point.

Tell us your problem